Bridge Construction
| Easthampton |
| Construction continues on the I-91 overpass on East Street between exits 17 and 18. Lanes are split. |
| Duration: 05/04/2009 - 12/31/2009 |
| Submitted By: RTIC |
| >> Back to Current Advisories |
* While MassTraveler works closely with MassHighway and local transportation authorities,
it is possible that not all projects are reported to us.
[ Add an Advisory ]